Initial Type Test (ITT) | TB11 & TB51 |
Containment Level | H2 |
Working Width (m) | W≤2,5 |
Class of Working Width | W7 |
Acceleration Severity Index (ASI) | A |
Post distance (m) | 1,33 |
Construction height from road surface (m) | 0,75 |
Tested system foundation | Anchored |