Initial Type Test (ITT) | TB11 & TB42 |
Containment Level | H1 |
Working Width (m) | W≤0,60 |
Class of Working Width | W1 |
Acceleration Severity Index (ASI) | B |
Post distance (m) | 2,00 |
Construction height from road surface (m) | 0,78 |
Test Lenght (m) | 40,00 |
Tested System Foundation | Anchored |