AG03 H2 M 2,00 (H2W4)

AG03 H2 M 2,00 (H2W4)

AG03 H2 M 2,00 (H2W4)

Initial Type Test (ITT) TB11 & TB51
Containment Level H2
Working Width (m) W≤1,30
Class of Working Width W4
Acceleration Severity Index (ASI) A
Modular system length (m)  
Post distance (m) 2,00
Construction height from road surface (m)  
Test Lenght (m)  
Tested System Foundation Single Sided / Rammed