Initial Type Test (ITT) | TB11 & TB51 |
Containment Level | H2 |
Working Width (m) | W≤1,00 |
Class of Working Width | W3 |
Acceleration Severity Index (ASI) | B |
Post distance (m) | 1,50 |
Construction height from road surface (m) | 0,85 |
Test Lenght (m) | 54,00 |
Tested System Foundation | Double Sided / Rammed |