TR H2W2 DS BW

TR H2W2 DS BW

TR H2W2 DS BW

Initial Type Test (ITT) TB11 & TB51
Containment Level H2
Working Width (m) W≤0,80
Class of Working Width W2
Acceleration Severity Index (ASI) B
Post distance (m) 1,50
Construction height from road surface (m) 0,95
Test Lenght (m) 54,00
Tested System Foundation Double Sided / Anchored