| Initial Type Test (ITT) | TB11 & TB51 |
| Containment Level | H2 |
| Working Width (m) | W≤1,3 |
| Class of Working Width | W4 |
| Acceleration Severity Index (ASI) | A |
| Post distance (m) | 2,25 |
| Construction height from road surface (m) | 0,85 |
| Test Lenght (m) | 54,00 |
| Tested System Foundation | Double Sided / Rammed |