| Initial Type Test (ITT) | TB11 & TB51 |
| Containment Level | H2 |
| Working Width (m) | W≤1,3 |
| Class of Working Width | W4 |
| Acceleration Severity Index (ASI) | A |
| Modular system length (m) | 4,50 |
| Post distance (m) | 3,00 |
| Construction height from road surface (m) | 0,95 |
| Tested system foundation | Single Sided / Rammed |