Initial Type Test (ITT) | TB11 & TB51 |
Containment Level | H4B |
Working Width (m) | W≤1,0 |
Class of Working Width | W3 |
Acceleration Severity Index (ASI) | A |
Modular system length (m) | |
Post distance (m) | 2,00 |
Construction height from road surface (m) | |
Test Length (m) | |
Tested System Foundation | Single Sided / Bridge |