TR H2-W2 ds

TR H2-W2 ds

TR H2-W2 ds

TR H2-W2 ds

Initial Type Test (ITT) TB11 & TB51
Containment Level H2
Working Width (m) W≤0,80
Class of Working Width W2
Acceleration Severity Index (ASI) B
Post distance (m) 0,75
Construction height from road surface (m) 0,85
Test Lenght (m) 40,50
Tested System Foundation Double Sided / Rammed